INSTALLATION GUIDE
Use a ruler and pencil to draw
a guiding edge. Mark where the
beginning edge of the channel
will be installed.
Mark holes where the mounng clip
will be fastened. Fasten two clips
per channel, each 1/4 distance the
full length of the channel from each
end. E.g. if the channel is 40 in. long,
mount each clip 10 in. from each end.
Fasten the mounng clips with an
electric drill and mounng screws.
Use applicable screw anchors if
required for installaon.
Hold the channel up to the guide
and mounng clip. Mark the channel
where the top edge of the mounng
clip will be located.
Screw the allen hardware into the
vercal bracket (prongs of stopper
facing down) with a #2 allen wrench.
Slide the vercal bracket into the chan-
nel and ghten with the allen wrench.
Ensure the boom edge of the allen
hardware meets the mark previously
noted on the channel.
Fasten the channel to the mounng
clip on the vercal surface with the
vercal bracket resng above the
mounng clip.
CHROMAPATH™ VERTICAL BRACKET
Page 1 of 1
1 2 3
4
5
6 7
V1.0
Commentaires sur ces manuels